Packard Lab Renovations cont.

Last semester I did a post about the renovations going on in Packard Lab Lobby. Now I am continuing this because many things have happened over winter break and in the past few days.

I took the 2 photos on the left side of the 4 photos on Monday (1/20/2014) and I took the photos on the right side today (1/24/2014). Now the before photos have everything all covered up and the after photos have many new renovations showing, such as the many screens in the lower right picture and the openness of the lobby in the upper right picture.

They are still working on the lobby, evident by all the tools and materials around, but they are far into the project and are getting closer to being done every day.

photo 2 before image photo 1 photo 1 before image photo 2

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s